Can It Go Any Slower? – July 7, 2024

As impatient as I am I moved forward on some items that are out of sequence, but DONE, unlike other issues! City of Marathon requires approvals for an inspection of rough plumbing, electrical and mechanical work before I can move forward. I had gutters installed, so we can feed the cistern (required for my PBAS permit) of reclaimed water. I got a used cistern, one of the only deals I could find now here.     The biggest news is…

0
Read More

Roof and Floor Update – May 3, 2023

After a long wait (in my mind) the roof is mostly complete. This week the final (I hope) concrete pour was completed. The wood trusses are installed, the plywood over the trusses are installed and the waterproof membrane is on! The exception for the roof is the final metal installation.         The concrete pour was to finalize the truss supports. The contractor decided to set the trusses and then pour the concrete around the set trusses. Why?…

8
Read More
Bad framing

The Second Floor Structure – Jan 5, 2023

Now that the first floor is up, and the concrete has cured enough, the contractor is putting up the temporary supports for the second floor. I am unsure when the second floor will be poured, but it will be soon (I hope!) The method to support the forms for the second floor are wood 4″x4″s, two are attached to a metal connector. The metal connector is used to lock the 4″x4″s together. The workers can place one on the floor…

2
Read More

Moving on up (to the first floor)! – Dec 21, 2022

Since the last posting the contractor has formed up the first (raised) floor and built the concrete block walls that enclose the first floor. This floor will contain the bedrooms and utility room. It seem to take a long time to form the floor and the support beams of poured concrete. Due to lots of building activity I had to wait an additional week to get this concrete pour completed. The workers used five 10 yard truckloads. It was hard…