First Floor Structural Work – October 19, 2022
The next step is framing the first floor (above grade). The supports have been constructed and the plywood for the subfloor has been installed. In Silicon Valley, the building are constructed with steel supports and metal floor deck to support the raised floor. But this is the Keys, and this is how it’s done. The next step is to install the rebar that will support the concrete pour for the subfloor. I’ve never seen the supports built of wood and…
0
Read More